Fire fighting System Installation at CFAO (Toyota)
Wednesday, June 25th, 2025
1. Laying of HDPE Pipes Underground and GI Pipes on the Surface.
[aigpl-gallery id=”999″]
2. Mounting Fire Fighting Monitors at Different Locations within theCompound.
[aigpl-gallery id=”1006″]
3. Assembling of Hot Dip Galvanized Steel Water Tank 10 x 5 x 3m (150m3) with External Ladder
[aigpl-gallery id=”1022″]
4. Electrical System
[aigpl-gallery id=”1019″]
5. Mechanical Installation
[aigpl-gallery id=”1026″]