Fire fighting System Installation at CFAO (Toyota)
Wednesday, June 25th, 2025
1. Laying of HDPE Pipes Underground and GI Pipes on the Surface.
2. Mounting Fire Fighting Monitors at Different Locations within theCompound.
3. Assembling of Hot Dip Galvanized Steel Water Tank 10 x 5 x 3m (150m3) with External Ladder
4. Electrical System
5. Mechanical Installation